LoginRegister

Home Improvement Contract Builder (USA)

Under California Business and Professions Code §§ 7159, 7159.5, 7191 and Civil Code §§ 1689.5–1689.7; Texas Property Code §§ 27.007, 41.007, 53.101, 53.254–53.259 and Business & Commerce Code ch. 601; Florida Statutes §§ 489.126, 489.1425, 713.015, 501.021–501.031; New York General Business Law §§ 770–771 and Lien Law §§ 34, 71-a; FTC Cooling-Off Rule (16 CFR 429). Provisions checked against the official statute texts 11.11.2026.

Building your contract…

What the contract includes

  1. Description of the Project and Description of the Significant Materials to be Used and Equipment to be Installed

    Address and type of the home, the work, the main materials and equipment, exclusions and incorporated documents.

  2. Materials and Allowances

    Who supplies what, owner-supplied items, allowances and how they adjust the price, substitutions.

  3. Contract Price

    Fixed price, or cost plus fee or time and materials with a maximum; no finance charge.

  4. Downpayment and Payments

    Down payment, payments only for completed work, lien releases on each payment, retainage or escrow by state, final payment.

  5. Note About Extra Work and Change Orders

    Changes only by a written change order signed before the work; what it must state; the form is attached.

  6. Approximate Start Date and Approximate Completion Date

    Start and completion dates, what counts as starting, contingencies, delays; Florida rules for large deposits.

  7. Permits and Inspections

    Who obtains permits and arranges inspections; work to code; Florida notice of commencement.

  8. License and Insurance

    License number, liability and workers’ compensation insurance with the state-required wording, recovery fund in Florida.

  9. Subcontractors

    Whether subcontractors are used, the list of subcontractors and suppliers, the contractor’s responsibility for them.

  10. Site Conditions, Access and Cleanup

    Working hours, utilities, protection of the home, daily and final cleanup, debris, lead-safe work in older homes.

  11. Warranty

    Workmanship warranty from completion, how defects are reported and fixed, manufacturers’ warranties; Texas chapter 27 notice.

  12. Lien Protection

    Releases on each payment and at the end, joint checks, state lien notices: California Mechanics Lien Warning, Florida notice to owner, Texas claims, New York notice.

  13. Termination

    Termination for breach after notice and time to cure, owner’s early termination, what is paid and returned.

  14. Disputes

    Negotiation, mediation, court or arbitration (with the state-required wording), attorney’s fees.

  15. Notices

    How notices are sent and when they count as received.

  16. General Provisions

    Governing law, whole agreement, changes in writing, assignment, severability, counterparts and e-signatures.

  17. Information about the Contractors State License Board (CSLB)

    The California notice about the contractors’ licensing board, word for word, in 12-point type.

  18. Additional Terms

    The parties’ own words, inserted as written.

  19. Acknowledgments

    Right to require a bond, copy of the contract, notices received.

  20. Right to Cancel

    The owner’s right to cancel within three business days (five for a California owner aged 65+, seven after a declared disaster), in the wording of the state and the FTC rule.

After signing

  1. Check the contractor’s license on the state board’s website (in California — CSLB; in Florida — DBPR; in New York City — DCWP) and ask for a certificate of insurance.
  2. Owner and contractor sign and date every page that requires it, including the notices; each keeps a completely filled-in signed copy before any work starts.
  3. If the contract was signed at home, do not start work and do not spend the deposit until the cancellation deadline in the contract has passed.
  4. Pay only for completed stages, and with each payment collect lien releases in the state’s statutory form; pay subcontractors who sent a notice by joint check.
  5. Put every change in a signed change order before the work it covers; keep invoices, photos and inspection records until the warranty ends.

What the builder checks against state law

  • Describe the work. A home improvement contract must describe the project; what is not written is not included.Basis: California Business and Professions Code § 7159, verified 11.11.2026
  • Enter the address of the home where the work is done.Basis: Standard contract practice, verified 11.11.2026
  • Enter the date of signing: the cancellation deadline is counted from it.Basis: FTC Cooling-Off Rule, 16 CFR Part 429, verified 11.11.2026
  • Enter the contract price — for cost-plus or time-and-materials, the maximum price. California requires it in dollars and cents.Basis: California Business and Professions Code § 7159.5, verified 11.11.2026
  • Enter the labor rate or the contractor’s fee.Basis: Standard contract practice, verified 11.11.2026
  • The down payment must be less than the contract price.Basis: Standard contract practice, verified 11.11.2026
  • California: the down payment may not exceed $1,000 or 10% of the contract price, whichever is less. Taking more is a misdemeanor (fine $100–$5,000) unless the contractor furnishes a bond or joint control approved by the Registrar.Basis: California Business and Professions Code § 7159.5, verified 11.11.2026
  • California: a home improvement contract with payments before completion must contain a schedule of payments in dollars and cents tied to the work (B&P 7159.5(a)(4)). For time-and-materials or cost-plus work, CSLB may treat biweekly invoices as non-compliant — prefer a fixed price with stages, or a bond approved by the Registrar.Basis: California Business and Professions Code § 7159.5, verified 11.11.2026
  • Florida: under s. 489.126 the 30-day permit duty is the contractor’s; if the owner pulls permits, the owner may be treated as an owner-builder (s. 489.103(7)) and takes responsibility for the work under the permit. The contract then counts the 90 days to start from the owner’s delivery of permits.Basis: Florida Statutes § 489.126, verified 11.11.2026
  • Florida: with an initial payment above 10% of the price, the contractor must apply for permits within 30 days and start work within 90 days after the permits are issued, or refund; failing that without just cause is a crime. The contract states these deadlines.Basis: Florida Statutes § 489.126, verified 11.11.2026
  • The down payment and progress payments add up to more than the contract price. Reduce them.Basis: California Business and Professions Code § 7159.5, verified 11.11.2026
  • Nothing is left for the final payment. Keeping part of the price until completion and the final lien releases protects the owner.Basis: Standard contract practice, verified 11.11.2026
  • Describe the work that must be completed before each progress payment. California requires each payment to reference the work or materials it pays for.Basis: California Business and Professions Code § 7159, verified 11.11.2026
  • Enter the amount of each progress payment in dollars.Basis: California Business and Professions Code § 7159, verified 11.11.2026
  • California: a progress payment may be due only for work already performed or materials already delivered — not on signing, ordering, permits or the start of work. Except for the down payment, payment ahead of the work is a misdemeanor.Basis: California Business and Professions Code § 7159.5, verified 11.11.2026
  • A progress payment seems tied to signing, ordering or the start of work rather than to completed work. Paying ahead of the work raises the owner’s risk; in New York payments must bear a reasonable relationship to the work.Basis: N.Y. General Business Law §§ 770–771, verified 11.11.2026
  • California: a contractor must be licensed for work of $1,000 or more or that needs a permit, and the contract must state the license number. An unlicensed contractor cannot sue for payment.Basis: California Business and Professions Code §§ 7048, 7031, verified 11.11.2026
  • California: work under $1,000 that needs no permit can be done without a license, but only if the contractor does not advertise as a contractor and has no employees on the job.Basis: California Business and Professions Code §§ 7048, 7031, verified 11.11.2026
  • Florida: the contractor’s certification or registration number must appear in every contract, and a contract made by an unlicensed contractor cannot be enforced by the contractor.Basis: Florida Statutes §§ 489.119(5)(b), 489.128, verified 11.11.2026
  • New York City: a home improvement contractor must hold a DCWP Home Improvement Contractor license, and the contract must state the license number.Basis: NYC DCWP Home Improvement Contractor license, verified 11.11.2026
  • Nassau, Suffolk, Westchester, Rockland and Putnam counties license home improvement contractors under local law. Check the contractor’s county license and add its number.Basis: County home improvement licenses (Nassau, Suffolk, Westchester, Rockland, Putnam), verified 11.11.2026
  • Texas has no state license for general or remodeling contractors. Electrical, plumbing and air-conditioning work must be done by trade licensees; some cities register contractors.Basis: Texas has no statewide general contractor license (trade licenses: TDLR, TSBPE), verified 11.11.2026
  • Enter the contractor’s business address: the notice of cancellation must state where the owner sends it.Basis: FTC Cooling-Off Rule, 16 CFR Part 429, verified 11.11.2026
  • California: the first page must show the contractor’s address, e-mail address and phone number for the Notice of Cancellation. Enter them in the contractor’s details.Basis: California Business and Professions Code § 7159, verified 11.11.2026
  • The work is set to start before the cancellation period ends. If the owner cancels, everything paid must be refunded and the contractor may get nothing for work done. Start after the deadline.Basis: Texas Business & Commerce Code ch. 601, verified 11.11.2026
  • Check the dates: the start cannot be before signing, and completion cannot be before the start.Basis: Standard contract practice, verified 11.11.2026
  • Enter the approximate start and completion dates: California and New York require them in the contract.Basis: N.Y. General Business Law §§ 770–771, verified 11.11.2026
  • Enter the insurance company and its phone number: the owner must be able to check the coverage (California, New York).Basis: California Business and Professions Code § 7159, verified 11.11.2026
  • New York: before work begins the contract must disclose the insurer’s contact information, including its address.Basis: N.Y. General Business Law §§ 770–771, verified 11.11.2026
  • The contractor has no liability insurance. Damage to the home or injuries on the job may then fall on the owner. Consider asking for a certificate of insurance.Basis: California Business and Professions Code § 7159, verified 11.11.2026
  • List the materials the owner supplies.Basis: Standard contract practice, verified 11.11.2026
  • List the allowance items and the amount for each.Basis: Standard contract practice, verified 11.11.2026
  • The additional terms seem to waive a right the law protects: the right to cancel, lien rights in advance, or a refund. Such terms are void or prohibited. Remove them.Basis: N.Y. Lien Law § 34, verified 11.11.2026
  • Texas: this contract does not create a lien on the homestead. A contractor’s lien on a homestead needs a written contract signed by both spouses before work, filed with the county clerk, and for repairs also signed at a lender’s, attorney’s or title company’s office with a 3-day right to rescind.Basis: Texas Constitution art. XVI, § 50(a)(5), verified 11.11.2026
  • Texas: the contractor must give the owner the disclosure statement (attached to the contract) before the owner signs. Hand it over in advance, not at the signing table.Basis: Texas Property Code ch. 53 (§§ 53.101, 53.254–53.259), verified 11.11.2026
  • Florida: the recovery fund notice must be followed by the board’s address and phone set by board rule. Check them on the DBPR website before signing.Basis: Florida Statutes § 489.1425, verified 11.11.2026
  • The owner may cancel within the period stated in the contract. The deadline is counted without Saturdays, Sundays and federal holidays, so it is never earlier than the law requires.Basis: FTC Cooling-Off Rule, 16 CFR Part 429, verified 11.11.2026
  • Home built before 1978: no more than 60 days before work that disturbs paint, the contractor must give the owner the EPA “Renovate Right” pamphlet and get a written acknowledgment; the work must be done by an EPA-certified firm.Basis: EPA Renovation, Repair and Painting Rule, 40 CFR 745.84, verified 11.11.2026
  • Contracts of $500 or less are outside the home improvement contract statute of this state; the contract still works, and the notices do no harm.Basis: N.Y. General Business Law §§ 770–771, verified 11.11.2026

Your answers are not stored on the server: the contract is built on request and the data is deleted immediately. Template version 2026-11-11.1.