Thailand Construction and Renovation Contract Builder

Under the Civil and Commercial Code of Thailand: hire of work (sections 587–607), penalty (sections 379–383) and termination (sections 386–391); the Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016); the Building Control Act B.E. 2522 (permit or notification); and the Revenue Code stamp duty schedule (instrument 4). Provisions checked against the text of the Code and the Royal Gazette 11.11.2026.

Building your contract…

What the contract includes

  1. Work and Site · งานที่จ้างและสถานที่

    What is built, where and for what use. Hire of work is a contract for a result: the contractor delivers the finished work (CCC section 587).

  2. Contract Documents · เอกสารสัญญา

    Drawings, BOQ and specification form part of the contract; in a conflict the contract prevails, then the drawings, then the BOQ.

  3. Materials and Equipment · วัสดุและเครื่องมือ

    Who supplies materials and of what quality. Tools are the contractor's (section 588), materials of good quality (589), the owner's materials used with care and the remainder returned (590).

  4. Contract Price · ราคาค่าจ้าง

    The price, its type (lump sum or BOQ unit rates), VAT and what it covers.

  5. Payments · การชำระเงิน

    Each payment is for a completed and accepted stage (CCC section 602), in proportion to the work; retention, late payment and suspension.

  6. Permits · การขออนุญาต

    Who files the permit application (or a section 39 bis notification) and by when, who pays, and what if it is refused.

  7. Time for Completion · ระยะเวลาการทำงาน

    When to start and finish; extension for force majeure if the contractor notifies within 7 days (a mandatory term for a private owner).

  8. Delay Penalty · ค่าปรับกรณีล่าช้า

    A penalty for each day of delay, deducted from the unpaid price; at 10% of the price the owner may terminate. On accepting the work the owner keeps the right to the penalty (section 381).

  9. Changes to the Work · การแก้ไขเพิ่มเติมหรือลดงาน

    The owner may modify, add or omit work without terminating; price and time are agreed in writing before the work; the contractor changes nothing on its own.

  10. Standard of Work · มาตรฐานงาน

    Work according to the drawings and permit, to legal and professional standards; the contractor warns if the owner's instructions are wrong (section 591).

  11. Site, Safety and Insurance · สถานที่ก่อสร้าง ความปลอดภัย และประกันภัย

    Site rules: safety, workers with permits, hours, neighbours, cleaning; damage to third parties is the contractor's responsibility (section 428).

  12. Inspection and Acceptance · การตรวจงานและการตรวจรับ

    The owner may inspect at any time (section 592); stages and the whole work are accepted by certificate; for a private owner silence is not acceptance.

  13. Risk and Ownership · ความเสี่ยงภัยและกรรมสิทธิ์

    Until handover the risk of loss lies with the party who supplied the materials (sections 603–604); everything the owner paid for or supplied belongs to the owner.

  14. Defects Liability · การรับประกันความชำรุดบกพร่อง

    Warranty on the structure and on the rest from handover, repair time, repair by third parties at the contractor's cost; concealed defects without time limit (section 600).

  15. Subcontracting · การจ้างช่วง

    Subcontractors with the owner's consent or freely; the contractor answers for them (section 607).

  16. Termination by the Owner · การบอกเลิกสัญญาโดยผู้ว่าจ้าง

    The owner terminates if the contractor did not start or is so late it cannot finish (section 593); penalty reached 10%; a breach was not cured after notice (section 387); or at will with compensation (section 605).

  17. Termination by the Contractor · การบอกเลิกสัญญาโดยผู้รับจ้าง

    The contractor terminates only for the listed breaches of the owner and after written notice with time to cure. For a private owner the grounds are in bold and the period is at least 30 days.

  18. Consequences of Termination · ผลของการเลิกสัญญา

    Settlement after termination: record of work done, refunds, handover of the site and documents (section 391).

  19. Stamp Duty · อากรแสตมป์

    Stamp duty under the Revenue Code (instrument 4): 1 Baht per 1,000 Baht of the price. By law the contractor is liable; the parties agree who bears the cost.

  20. Notices · การบอกกล่าว

    How the parties notify each other: in writing to the addresses in the contract; termination only by letter.

  21. Governing Law and Disputes · กฎหมายที่ใช้บังคับและการระงับข้อพิพาท

    Thai law; negotiation and optionally an engineer's opinion first, then a Thai court.

  22. Final Provisions · ข้อกำหนดทั่วไป

    Special conditions, changes only in writing, the Thai text prevails, originals.

After signing

  1. Attach the drawings, the bill of quantities and the specification listed in Annex 1, and have both parties sign every page of them and of the contract.
  2. The contractor affixes and cancels stamp duty for the amount stated in the contract, or pays it electronically: an unstamped contract is not admissible in a civil court.
  3. File the building permit application, or the notification, within the time agreed. Do not start work that needs a permit before the permit is issued.
  4. Pay each instalment only after the stage is inspected and the Certificate of Acceptance is signed, by bank transfer, and keep every receipt. Agree every change on the Change Order form before the work is done.
  5. At final acceptance, write down the date: the warranty periods and the retention release run from it. Report defects to the contractor in writing and keep a copy.

What the builder checks against the law

Your answers are not stored on the server: the contract is built on request and the data is deleted immediately. Template version 2026-11-11.1.