Thailand Construction and Renovation Contract Builder
Under the Civil and Commercial Code of Thailand: hire of work (sections 587–607), penalty (sections 379–383) and termination (sections 386–391); the Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016); the Building Control Act B.E. 2522 (permit or notification); and the Revenue Code stamp duty schedule (instrument 4). Provisions checked against the text of the Code and the Royal Gazette 11.11.2026.
Building your contract…
Building your contract…
What the contract includes
Work and Site · งานที่จ้างและสถานที่
What is built, where and for what use. Hire of work is a contract for a result: the contractor delivers the finished work (CCC section 587).
Contract Documents · เอกสารสัญญา
Drawings, BOQ and specification form part of the contract; in a conflict the contract prevails, then the drawings, then the BOQ.
Materials and Equipment · วัสดุและเครื่องมือ
Who supplies materials and of what quality. Tools are the contractor's (section 588), materials of good quality (589), the owner's materials used with care and the remainder returned (590).
Contract Price · ราคาค่าจ้าง
The price, its type (lump sum or BOQ unit rates), VAT and what it covers.
Payments · การชำระเงิน
Each payment is for a completed and accepted stage (CCC section 602), in proportion to the work; retention, late payment and suspension.
Permits · การขออนุญาต
Who files the permit application (or a section 39 bis notification) and by when, who pays, and what if it is refused.
Time for Completion · ระยะเวลาการทำงาน
When to start and finish; extension for force majeure if the contractor notifies within 7 days (a mandatory term for a private owner).
Delay Penalty · ค่าปรับกรณีล่าช้า
A penalty for each day of delay, deducted from the unpaid price; at 10% of the price the owner may terminate. On accepting the work the owner keeps the right to the penalty (section 381).
Changes to the Work · การแก้ไขเพิ่มเติมหรือลดงาน
The owner may modify, add or omit work without terminating; price and time are agreed in writing before the work; the contractor changes nothing on its own.
Standard of Work · มาตรฐานงาน
Work according to the drawings and permit, to legal and professional standards; the contractor warns if the owner's instructions are wrong (section 591).
Site, Safety and Insurance · สถานที่ก่อสร้าง ความปลอดภัย และประกันภัย
Site rules: safety, workers with permits, hours, neighbours, cleaning; damage to third parties is the contractor's responsibility (section 428).
Inspection and Acceptance · การตรวจงานและการตรวจรับ
The owner may inspect at any time (section 592); stages and the whole work are accepted by certificate; for a private owner silence is not acceptance.
Risk and Ownership · ความเสี่ยงภัยและกรรมสิทธิ์
Until handover the risk of loss lies with the party who supplied the materials (sections 603–604); everything the owner paid for or supplied belongs to the owner.
Defects Liability · การรับประกันความชำรุดบกพร่อง
Warranty on the structure and on the rest from handover, repair time, repair by third parties at the contractor's cost; concealed defects without time limit (section 600).
Subcontracting · การจ้างช่วง
Subcontractors with the owner's consent or freely; the contractor answers for them (section 607).
Termination by the Owner · การบอกเลิกสัญญาโดยผู้ว่าจ้าง
The owner terminates if the contractor did not start or is so late it cannot finish (section 593); penalty reached 10%; a breach was not cured after notice (section 387); or at will with compensation (section 605).
Termination by the Contractor · การบอกเลิกสัญญาโดยผู้รับจ้าง
The contractor terminates only for the listed breaches of the owner and after written notice with time to cure. For a private owner the grounds are in bold and the period is at least 30 days.
Consequences of Termination · ผลของการเลิกสัญญา
Settlement after termination: record of work done, refunds, handover of the site and documents (section 391).
Stamp Duty · อากรแสตมป์
Stamp duty under the Revenue Code (instrument 4): 1 Baht per 1,000 Baht of the price. By law the contractor is liable; the parties agree who bears the cost.
Notices · การบอกกล่าว
How the parties notify each other: in writing to the addresses in the contract; termination only by letter.
Governing Law and Disputes · กฎหมายที่ใช้บังคับและการระงับข้อพิพาท
Thai law; negotiation and optionally an engineer's opinion first, then a Thai court.
Final Provisions · ข้อกำหนดทั่วไป
Special conditions, changes only in writing, the Thai text prevails, originals.
After signing
- Attach the drawings, the bill of quantities and the specification listed in Annex 1, and have both parties sign every page of them and of the contract.
- The contractor affixes and cancels stamp duty for the amount stated in the contract, or pays it electronically: an unstamped contract is not admissible in a civil court.
- File the building permit application, or the notification, within the time agreed. Do not start work that needs a permit before the permit is issued.
- Pay each instalment only after the stage is inspected and the Certificate of Acceptance is signed, by bank transfer, and keep every receipt. Agree every change on the Change Order form before the work is done.
- At final acceptance, write down the date: the warranty periods and the retention release run from it. Report defects to the contractor in writing and keep a copy.
What the builder checks against the law
- The contractor is a business and the owner a private person building a home: the controlled-contract rules apply. The builder includes the mandatory terms (BOQ, payments in proportion to work, 5-year and 1-year warranty, delay penalty, 30 days to cure) and prints the Thai text larger. Terms contrary to these rules are disregarded by law.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3–4, verified 11.11.2026
- The advance and stage payments exceed the contract price, so the final payment would be negative. Reduce the stage amounts or the advance.Basis: Civil and Commercial Code, section 602, verified 11.11.2026
- Less than 5% of the price is left for the final payment: the owner has little leverage to get the punch list finished.Basis: Civil and Commercial Code, sections 602, 599, verified 11.11.2026
- The advance exceeds 30% of the price. For a private owner, payments must be in proportion to the work done; a large advance is a risk if the contractor never starts.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3(4), verified 11.11.2026
- For a new house for a private owner, the contract must state the full price including VAT. Choose "Price includes VAT" and enter the price with tax.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3(2), verified 11.11.2026
- For a new house for a private owner, a bill of quantities with prices (BOQ) is mandatory. Attach it to the contract.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3(3), verified 11.11.2026
- Without drawings it is unclear what house is being built, and disputes about quality and scope cannot be resolved. For a private owner, the building design must be described in the contract.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3(1), verified 11.11.2026
- For a private owner, the delay penalty must be at least 0.01% of the price per day.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3(11)(ข), verified 11.11.2026
- Without a delay penalty the owner must prove the actual loss caused by any delay.Basis: Civil and Commercial Code, sections 596, 379, verified 11.11.2026
- A penalty above 0.2% per day (over 6% of the price per month) may be reduced by a court as excessive.Basis: Civil and Commercial Code, section 383, verified 11.11.2026
- For a new house for a private owner, the structural warranty must be at least 5 years from handover.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3(7)(ก), verified 11.11.2026
- By law the contractor is liable for defects in a building on land for 5 years. A shorter period applies only by agreement, and never to defects the contractor concealed.Basis: Civil and Commercial Code, section 600, verified 11.11.2026
- For a private owner, the warranty on other parts of the house, fences and walls must be at least 1 year.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3(7)(ข)(ค), verified 11.11.2026
- By default the law gives one year. With no warranty the owner loses free repair of defects appearing after handover.Basis: Civil and Commercial Code, section 600, verified 11.11.2026
- For a private owner a term that silence means acceptance is prohibited. Untick it.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 4(9), verified 11.11.2026
- For a private owner the contractor may not pass the work to others without the owner's consent. Choose "Only with the Owner's written consent".Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 4(7), verified 11.11.2026
- For a private owner, the contractor must give at least 30 days to cure before terminating.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3(10), verified 11.11.2026
- For a new house for a private owner, the construction period is counted from the date the permit is issued. A fixed date fails if the permit is delayed.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3(6), verified 11.11.2026
- The start date is before signing.Basis: Civil and Commercial Code, section 587, verified 11.11.2026
- A new house almost always needs a permit or a notification. Without it the authority may stop the works and order demolition. The exception is an area where the Building Control Act is not in force; check with the local office.Basis: Building Control Act B.E. 2522 (1979), sections 21 and 39 bis, verified 11.11.2026
- Repairs that do not alter the structure need no permit. An extension, new columns or beams, moving load-bearing walls, or adding floor area or weight is an alteration and needs an application.Basis: Ministerial Regulation No. 11 (B.E. 2528) under the Building Control Act — to be verified, verified 11.11.2026
- Renovation for a private owner: the contractor issues a Thai-language receipt for every payment, with the work details, stages and the delay penalty (2023 notification).Basis: Contract Committee Notification on residential renovation services (payment receipts) B.E. 2566 (2023) — to be verified against the Gazette, verified 11.11.2026
- A house built on another person's land without a right to it becomes the landowner's property. Safer: register a lease or superficies at the Land Office before work starts.Basis: Civil and Commercial Code, sections 146, 1310, verified 11.11.2026
- A foreigner generally cannot own land in Thailand but can own a house on land held under a lease or superficies. Check who holds the land.Basis: Land Code section 86 (to be verified); CCC sections 146, 1310, verified 11.11.2026
- The contractor is a foreign individual: working in Thailand requires a work permit, and a foreign construction business needs a licence. Otherwise the work may be stopped.Basis: Foreign Workers Management Emergency Decree B.E. 2560 and List Three of the Foreign Business Act B.E. 2542 — to be verified, verified 11.11.2026
- The owner is a company: it usually withholds tax (generally 3%) from each payment and issues a certificate. The contract allows for this.Basis: Withholding tax on hire-of-work payments by a juristic person (usually 3%) — to be verified, verified 11.11.2026
- The special conditions contain a term prohibited for a private owner: no refund, deemed acceptance, exclusion of liability or termination without notice. The law disregards such a term; remove it.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 4, verified 11.11.2026
- Write special conditions in English or Thai: the contract is in Thai and English.Basis: Contract Committee Notification on residential building construction as a controlled-contract business B.E. 2559 (2016), clause 3, verified 11.11.2026
Your answers are not stored on the server: the contract is built on request and the data is deleted immediately. Template version 2026-11-11.1.